09-19 2025
Test site: On site test results:
A tunnel lining inspection site: Test effect picture:
Test site of a tunnel in Yuxi, Yunnan: 100MHz radar advanced prediction test results: According to the measured data, the predicted results are as follows:
The product is measured in detail according to the on-site construction conditions, using interface coupling and continuous data acquisition methods.