Test site: On site test results:
09-19 2025
测试现场:现场测试结果:
A tunnel lining inspection site: Test effect picture:
某隧道衬砌检测现场:测试效果图:
Test site of a tunnel in Yuxi, Yunnan: 100MHz radar advanced prediction test results: According to the measured data, the predicted results are as follows:
云南玉溪某隧道测试现场:100MHz雷达超前预报测试结果:据测得数据预报结果如下:
The product is measured in detail according to the on-site construction conditions, using interface coupling and continuous data acquisition methods.
产品详细根据现场施工条件,采用界面耦合式,连续数据采集方式测量。